Cart0 items
Total price $0

MF/HF

Select by:
Retail price
From
To
0
4,525
9,050
13,575
18,100
Brand
Certificate

Useful articles


Factory acceptance tests

Factory acceptance tests

Commissioning is the process of fine-tuning the installed equipment so that it works correctly and performs its functions. They are carried out in stages, starting from the manufacturer's workshop, where important equipment is checked before being sent to the shipyard. These checks carried out by the manufacturer are called Factory Acceptance Test (FAT). They confirm that the equipment was in order when it left the shop.

to order
Certificate
  • RMRS
  • RRR
pcs.
to order
Certificate
  • RRR
pcs.
to order
Certificate
  • RMRS
pcs.
to order
Certificate
  • RMRS
pcs.
to order
Certificate
  • RMRS
  • RRR
pcs.
to order
Certificate
  • RMRS
pcs.

MF / HF radio equipment designed to operate in the frequency range 0.3 ... 30 MHz. At these frequencies, it is carried out in radio telephony mode, data and facsimile.
MF / HF radio and radio stations installed on all fishing and maritime vessels operating in areas A3 and A4 independently from their displacement.